news center
Production News Express
2022-08-02 views 613
On August 2nd, YangziChangbo delivered the 1800TEU container ship "WAN HAI 178 " to ShangjingLogistics Co., Ltd. by electronic signing. It departed from theshipyard wharf at noon on the same day and started its maidenvoyage.
The ship waslaunched on June 7th with underwater period of 56 days. During the four days ofsea trials, which began on July 18th, 492 opinions were put forward by the shipowners and ABS surveyors. The project team methodically sorted out andclassified all the opinions on the sea trial, identified the responsibleworkshop and responsible person, and closed all the opinions in only 7 days toensure the ship’s delivery on August 2nd.
2024.03.21
2024.03.19
The sixth 15,000TEU container vessel "ONE FOREVER" built for…
2024.03.12
The second 2400TEU container vessel "CUL KLANG" built for Ch…
2024.03.07
The Eighth 3500TEU Container Vessel "MAERSK SEQUOIA" Built f…
2024.03.02
Yangzi Mitsui shipbuilding delivered the first 63200DWT bulk…
2024.03.01
LNG Dual-Fuel 7000TEU Container vessel "ZIM PEARL" was deliv…
2024.02.24
The 16,000TEU container vessel "MSC MARIE" was delivered and…
2024.02.18
Yangzi Mitsui's first 29800DWT Great Lakes self-unloading b…
2024.01.22
LNG dual-fuel 7000TEU container ship "ZIM OPAL" is delivered…
2024.01.22
The 16,000TEU container ship "MSC IDANIA" is delivered and l…