news center
Production News Express
2024-05-01 views 127
On April 30, the second 63200DWT bulk carrier "DARYA NITYA" built by Yangzi-Mitsui Shipbuilding for shipowner Chellaram was delivered and departed from the shipyard wharf into operation.
On April 29, Yangzi-Mitsui Shipbuilding and ship owner Chellaram jointly held a grand naming ceremony for the new vessel. The godmother, Ms. Preeti Amalia D'Costa, named the vessel "DARYA NITYA".
"DARYA NITYA" was built in accordance with the rules and regulations of class DNV. The vessel cut the first plate on June 29, 2023, with a construction period of about 10 months.
On April 29, "DARYA NITYA" was signed and delivered under the joint witness of representatives of all parties.
2024.09.24
Delivery and Departure of the Tenth LNG Dual Fuel 7000TEU Co…
2024.09.14
The first batch of 40,000 CBM Dual-Fuel LPG/ Ammonia Carrier…
2024.09.11
Delivery and Departure of the Fourth 1260TEU Methanol Dual F…
2024.09.02
Project Conclusion| Delivery and Departure of the Ninth 1600…
2024.08.29
Delivery and Departure of 66,000DWT Wide-Beam Bulk Carrier …
2024.08.23
Delivery and Departure of 40000 DWT Bulk Carrier "APPIA" bui…
2024.08.22
Delivery and Departure of the Third 1260TEU Methanol Dual Fu…
2024.08.21
Delivery and Departure of 66,000DWT Wide-Beam Bulk Carrier "…
2024.08.06
Delivery and Departure of the Ninth LNG Dual Fuel 7000TEU Co…
2024.07.25
The 52000DWT Bulk Carrier "Huayuan 505" of Yangzijiang Shipp…