news center
Production News Express
2024-04-17 views 129
On April 12, The second 40000CBM Dual Fuel LPG/Ammonia Carrier "GASCHEM AMERICA" built by Yangzi-Mitsui Shipbuilding for German Shipowner HARTMANN was successfully signed and delivered. Our group and the HARTMANN held a grand naming ceremony for the new vessel. Ms. Ni Weifang, the godmother, named the new vessel "GASCHEM AMERICA" and tossed champagne.
The construction period of the vessel is about 12.5 months, which is three months ahead of the contract delivery date. "GASCHEM AMERICA" started her maiden voyage on April 16.
2024.09.24
Delivery and Departure of the Tenth LNG Dual Fuel 7000TEU Co…
2024.09.14
The first batch of 40,000 CBM Dual-Fuel LPG/ Ammonia Carrier…
2024.09.11
Delivery and Departure of the Fourth 1260TEU Methanol Dual F…
2024.09.02
Project Conclusion| Delivery and Departure of the Ninth 1600…
2024.08.29
Delivery and Departure of 66,000DWT Wide-Beam Bulk Carrier …
2024.08.23
Delivery and Departure of 40000 DWT Bulk Carrier "APPIA" bui…
2024.08.22
Delivery and Departure of the Third 1260TEU Methanol Dual Fu…
2024.08.21
Delivery and Departure of 66,000DWT Wide-Beam Bulk Carrier "…
2024.08.06
Delivery and Departure of the Ninth LNG Dual Fuel 7000TEU Co…
2024.07.25
The 52000DWT Bulk Carrier "Huayuan 505" of Yangzijiang Shipp…