news center
Production News Express
2024-06-15 views 207
In the afternoon of June 14, the seventh 16000TEU container vessel "MSC MAURA" built by our group’s Yangzi Xinfu Shipbuilding for MSC and SEAPAN shipowners, was delivered and departed from the wharf to be operated by the MSC fleet.
On June 12, our group and the ship owner jointly held a naming and praying ceremony for the new vessel. Ms. Dai Cheng named the new vessel "MSC MAURA", and DNV surveyor Zhang Xiaodong, on behalf of the classification society, presented the first captain of "MSC MAURA" with a delivery plaque.
The signing and delivery ceremony of "MSC MAURA" was held on June 12.
2024.09.24
Delivery and Departure of the Tenth LNG Dual Fuel 7000TEU Co…
2024.09.14
The first batch of 40,000 CBM Dual-Fuel LPG/ Ammonia Carrier…
2024.09.11
Delivery and Departure of the Fourth 1260TEU Methanol Dual F…
2024.09.02
Project Conclusion| Delivery and Departure of the Ninth 1600…
2024.08.29
Delivery and Departure of 66,000DWT Wide-Beam Bulk Carrier …
2024.08.23
Delivery and Departure of 40000 DWT Bulk Carrier "APPIA" bui…
2024.08.22
Delivery and Departure of the Third 1260TEU Methanol Dual Fu…
2024.08.21
Delivery and Departure of 66,000DWT Wide-Beam Bulk Carrier "…
2024.08.06
Delivery and Departure of the Ninth LNG Dual Fuel 7000TEU Co…
2024.07.25
The 52000DWT Bulk Carrier "Huayuan 505" of Yangzijiang Shipp…